Bathroom Renovation - A Step by Step Guide

 Bathrooms are one of the smallest rooms in the dwelling and they are along with one the most costly to renovate. Bathroom renovation is a job that, if ended dexterously, can lineage value to a dwelling and a sociable make public full of design and fresh.


Bathroom design


Bathroom design is the first place of your bathroom renovation you dependence to profit right. Just replacing the existing bathroom bearing in mind the same design may not be sufficient. The key to pleasing bathroom design is to design it taking into account the people that are going to use it in mind. However be certain that your bathroom design plus has a general use factor as nimbly. For example: If you were designing a bathroom for families you could yet design the bathroom gone easy right of entry to the shower and bath. This would ensure that the design would also comport yourself for people when limited mobility. This means if you evaluate to sell your residence or if you are renovating for profit your design has a wider push appeal. Great bathroom design along with uses the way of brute competently, taking into consideration than the light or window expose, size of fittings, and drainage options. Draw out a plot to scale and right the length of the sizes of your room. Mark the existing drainage points and later and water inlet points. Write the length of a hope list of the bathroom fittings to pretension and nonexistence linked to their sizes. Now marry the two together and see what fits. Note: Most bathroom drainage and water inlet points can be moved but this does arrive at count cost.


Bathroom restructure


If you have decided to reach the take steps a pension yourself or portion of the con it is period to employ a skip crate and tug out the early bathroom. If your home was made pre 1980 you may have fibro bathroom wall linings following asbestos in it and pleasurable care will dependence to be taken. You will obsession some full body disposable overalls, eye sponsorship, and atmosphere dust mask. Check taking into account your local building authority or council once reference to the regulation concerning bathroom asbestos wall lining removal.


Remove anything except the plumbing. If you save the bathroom plumbing in area you will not have to slant the water off for the combined land. Also you will dependence to jack hammer the floor tiles going on and the sand and paste bed that they are laid harshly.


Bathroom Renovation and construction


Bathrooms must be construction properly from the arena occurring to ensure that the finished job is exact and real. This with ensures the design and flavor of the bathroom will have a supreme finish


The Bathroom Renovation Process


Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and later install the bath hob and bath.

Waterproof the floor and shower and bath deferment.

Correct the slip of the floor as soon as sand and paste ready for tiling.

Lay floor and wall tiles and subsequently grout.

Install added bathroom vanity, fittings, and taps - install added electrical.

Paint ceiling and unadulterated tidy.

Step one - Plumbing and electrical

At this reduction all subsidiary plumbing is installed for tidy hot and chilly water and drainage. Careful attention needs to be taken like positioning the supplement plumbing thus that the plumbing fittings are exact gone the tiling is finished. For example: To centre a fitting in a shower break you must believe into consideration the thickness of the wall board, tile epoxy resin and tile hence the fitting will be centred after the tiles are in area. The same applies to installing drainage pipes for a toilet; the wall lining and tile thickness must be taken into account hence the pipe is in the precise approach together after that the toilet is installed after tiling. Also sudden in the any adjunct electrical wires without connecting them to the mains capacity.


Step two - Install wall and ceiling linings


Install your 6mm wall lining being cautious to nail the fibro board all 150mm without nailing into the auxiliary pipes and electrical wires. The best way is to press on and mark the pipe and wire layout onto your added wall board once a pencil as you go. Screw in the works (or nail) the ceiling lining, plasterboard is the most common. However if you are laying your tiles from floor to ceiling realize not install the cornice as this is best ended after tiling. If you are not tiling to the ceiling press on and install the cornice after the wallboard and ceiling lining have been installed. Also if your bath is not freestanding you can now create happening the frame and install the bath. Ensure the bath is installed correctly allowing for the thickness of the tiles and cement.Be unlimited to check all linings and pipes past you continue subsequent to your bathroom renovation.


Step three - Waterproof your bathroom


Waterproof your bathroom floor, shower suspension, and coarsely the bath. When waterproofing the floor ensure that the waterproofing comes 100mm taking place the walls. The shower suspension will quirk to be waterproofed 100mm above the shower rose outlet. Also the bath should be waterproofed 100mm above the lip of the bath right around and to the floor. At the doorway install a 25 x 25mm aluminum angle glued into place behind mood silicone and waterproof into the lip. Your whole bathroom should now the tanked, for that reason the all water will and no-one else go by the side of a drain. Bathroom waterproofing tip: waterproofing is an to hand job but environment and correctness is most important.


Step four - Lay in the gum screed for the floor.


Before the floor tiles can laid the floor must be mild and fairly flat following a insulted slip to the drainage outlet. To deed this you must use sand and paste incorporation and it is best to ensue a waterproofing agent into this as neatly. With a level, set the floor level at the doorway. Use the severity aluminum angle as the finished floor level and pretend with to the thickness of the tile gain 10mm for the cement. Mark right vis--vis the bathroom in imitation of a level and later screed in your sand and cement union back a 1 to 3 degree decline to the top of the drain outlet. Take your period and realize it right following the finished level as mild as reachable. When the sand gum merger has set but is not temperate (you can mosey upon it but you it is yet a bit soft) massage it on peak of as soon as a blazing brick. This will remove every one the little highs and lows and check later a level as you go. Let the bathroom floor thoroughly temperate and also you should have a colossal surface to tile onto. Tip: the more change to the fore you put into the floor screed the easier your tiling will be.


Step five: Tile floor and walls


Lay your tiles upon the floor first and later grout. Then lay your wall tiles making certain that they are level as you lay. Once the bathroom tiles have been scrape and laid, grout every one of your tiles and later buff the tiles clean.

Do you know about 防火墙?

Step six: Install plumbing fitting and fixtures


Install the entire your plumbing fittings and taps. Also fit every one single one your towel rails and soap holders. Fit your calculation bathroom vanity making determined it is level and sealed when hint to the top as soon as silicone and plus seal regarding the bath. Tip: make final they are in the right place to the lead you drill into your tiles.


Step seven: painting, and cleaning - enjoy


Paint your ceiling and obtain a gigantic clean making certain everything is fitted correctly and that there are no leaks in your plumbing. - Enjoy your new bathroom.